Thursday, March 25, 2021

Thursday week 2 day 8 of renovation

 Again a somewhat quiet day. The electricians finished the wiring for all of the electrical outlets and switches. The plumbers were here to install the lines for the bar sink and the refrigerator ice maker. The laundry room was worked on and some of the electric and water lines were moved. The picture is pretty much the same although they have been cleaning up nicely.



Week Two day 7

 Not a lot a change today. Electrical boxes installed for the can lights 


Wednesday, March 24, 2021

Tuesday (week 2 day 6 of renovation)

 The unusually nice weather has been a March bonus as the workers were able to set up their saws in the driveway. There was lots of dust as the beams and supports for the vaulted ceiling were cut. I’m happy to see it floating around the driveway and backyard instead of our garage. It was also a bonus because the heat doesn’t have to be on while the doors are open as they walk in and out of the house. It won’t show up in the pictures but the island has been drawn on the floor and so we are able to visualize where things will be a little better. The nice weather also got me into the yard doing a little of the spring clean up and away from the reconstruction noise inside. 

The vaulted ceiling framing completed today





Monday, March 22, 2021

Week 2 Day 5

 Wow! That was our reaction at the end of today’s work. The openings to the family room were made today and we are surprised at how much they were able to open it up. The original doorway was widened and a new opening was made. The vaulting over the eating area was framed in more and the laundry room was started. We walked around tonight visualizing how cool it is going to be to see through to the golf course from the kitchen areas. 

From the family room looking into the kitchen.
Looking out from what will be soft seating area

Looking up to area over eating area

The 2 openings to the family room

Looking back to the eating area

A look from the approximate area of the island stove 
Or kind of my view while cooking
The skylights in the vaulted ceiling


The skylights in the vaulted ceiling area

A look as you enter from the laundry room


Saturday, March 20, 2021

Day 4 Friday. End of the week

 Today the progress was all about being able to vault  the ceiling over the kitchen eating area. They decided it could be accomplished with some added support beams. Most of the work today was about getting this accomplished. So no great changes in the pictures.

View of the skylights with a few 2 x 4’ s eliminated.

View into the laundry room where a pocket door will be.



Supports added while vaulted ceilings are being made. Also decided to replace the door to the deck . Just another $$$$

Friday, March 19, 2021

Day 3 smaller changes

 Day 3 is a miserable, cold, rainy, windy, March Ohio day. The crew arrives at 8 am and begins work. The remaining floor is removed and the sky light area of the ceiling is removed. The plan is to vault the ceiling area over the kitchen table since it was open attic space. The first rollaway trash bin has been filled and replaced with an empty one. Habitat for humanity has collected the cupboards we removed and hopefully someone will enjoy them in a new house. As far as pictures go there isn’t a lot of change from day 2 although it does look a little less messy. It is hard to picture how the sky lights might be changed but I took these pictures today.


Looking toward the foyer from the kitchen. All flooring has been removed.

Looking up at attic space

Sky light area to be vaulted over kitchen table.