Friday, March 19, 2021

Day 3 smaller changes

 Day 3 is a miserable, cold, rainy, windy, March Ohio day. The crew arrives at 8 am and begins work. The remaining floor is removed and the sky light area of the ceiling is removed. The plan is to vault the ceiling area over the kitchen table since it was open attic space. The first rollaway trash bin has been filled and replaced with an empty one. Habitat for humanity has collected the cupboards we removed and hopefully someone will enjoy them in a new house. As far as pictures go there isn’t a lot of change from day 2 although it does look a little less messy. It is hard to picture how the sky lights might be changed but I took these pictures today.


Looking toward the foyer from the kitchen. All flooring has been removed.

Looking up at attic space

Sky light area to be vaulted over kitchen table.