End of week 11 update.
Steve the painter was around most of the week doing some painting and lots of prep work. We decided to paint the laundry/garage door dark after seeing how dirty it has looked with the workers going in and out these past months. I love it. The walls are not painted yet but will be a light shade of gray.
There was a little problem with the utility bath countertop and Jen, the designer stopped in today to discuss. The top has an overhang which she designed to have cut always for the door molding and be the same on the other side. At first it seemed a little strange but I think now it is all worked out.The backsplash over the bar is finished after an almost design error. I was out and the installer planned on putting it up in a vertical pattern instead of horizontal because it wasn’t spelled out in the designers plan. Luckily I saw it laid out and corrected before he cut anything.
The finished result looks good.
The appliances were delivered on Thursday and hopefully we will be able to get them installed sometime next week. The quick oven and the dryer are still on backorder.
Being that it is the Memorial Day weekend all but Steve the painter left early on Friday and won’t return until Tuesday. But we have nice weather to look forward to and 3 days of golf set up with friends.
1 comment:
Oh you are being so patient, but everything I see looks beautiful! You know how to do it right❤️ Jools
Post a Comment